News · Company
A second production line at our Germany facility
Assembly capacity has doubled at the facility where every KREA Swiss sprayer is built and tested, to keep pace with lead times as OEM and direct orders both grow.
Every unit is still built and function-tested individually before it ships, on the same line and to the same standard as before — the second line adds capacity, it does not change how a unit is built or checked. Design engineering and testing both stay in Switzerland; assembly and final test remain in Germany, as they have since the current facility opened.
The change is aimed mainly at lead times on larger OEM orders, which had started to stretch as demand grew across both the direct and reseller side of the business.